By Month

Determination of Nonsignificance: PSE - Replace an existing 1-1/8"residential gas distribution line

From March 01, 2018 8:00 am until March 22, 2018 4:00 pm
NOTICE IS HEREBY GIVEN that the City of Edmonds has issued a Determination of Nonsignificance for the following project.

PROJECT DESCRIPTION: Replace an existing 1-1/8 inch residential gas distribution line serving 810 & 820 Hindley Lane. The replacement line will be installed via horizontal directional boring a minimum of 3 feet under Hindley Creek.

PROJECT PROPONENT: Puget Sound Energy

DATE DNS ISSUED: March 1, 2018

PROJECT LOCATION: 810 & 820 Hindley Lane and the adjacent public right-of-way in Hindley Lane.

SEPA COMMENTS: Any comments on the proposal must be submitted in writing by March 15, 2018.

APPEAL PERIOD: Any appeal must be submitted in writing along with the required fee no later than 4:00 PM on March 22, 2018. Appeals must be based on specific factual evidence in the record.

SEPA MATERIALS: The SEPA Checklist, project plans, vicinity map and DNS are available at www.edmondswa.gov through the Permits Online link. Search for file number STF20180004. These materials are also available for viewing at the Planning Division, located on the second floor of Edmonds City Hall, 121 5th Ave N, Edmonds, WA 98020.

CITY CONTACT: Mike Clugston, Associate Planner michael.clugston@edmondswa.gov 
425-771-0220